Targeting and Scheduling settings determine the following:
- Which Nodes will be used (targeted)
- The number of Nodes used per testing instance
- The time period(s) during which the test will run
- Frequency of the test runs

Assign Targeting and Scheduling
If configuring at the Folder or Test level, first disable inheritance of Targeting and Scheduling settings, then edit configuration settings per the table below:
Targeting and Scheduling Settings | |
Setting | Description |
| Nodes | The specific Nodes which this test will run on. (Input Node names or use the list function to select Nodes) |
| Run On | The number of Nodes that will run the test at each scheduled interval.
|
| Frequency | The time interval between Test runs. |
| Node Distribution |
|
| Run Schedule | Times during which Tests will run. (Must be pre-configured in the Settings Module. You can Save your progress and return to this configuration if you need to create a Schedule.) |
| Maintenance Schedule | Times during which Tests will not run. (Must be pre-configured in the Settings Module. You can Save your progress and return to this configuration if you need to create a Schedule.) |